
Project Description
Executed works:
– Interior courtyard insulation (above the garage) with 2 layers
– Polystyrene on the roof (warm) insulated with 2 layers
– Insulated inner courtyard plinth with sheet metal
– Insulated exits from apartments on a polystyrene roof and covered in tin
– Produced and mounted the attic at the 3 staircase exits
– Mounted the main attic of the building
– Various small works with tin
Project Details
- Client: Porr
- Location: Hamburg, Germany
- Project Begin: March 2019
- Project End: July 2019
Project Management
The construction designed in a modern style.